Matrix E7x Especificaciones Pagina 51

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 90
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 50
47
9.8 DRIVE AXLE SET REPLACEMENT
1) Turn off the power and disconnect the cord from the machine.
2) Remove both front disks from the machine as outlined in Section 9.1.
3) Remove both front shrouds from the machine as outlined in Section 9.2.
4) Remove the ECB belt as outlined in Section 9.5.
5) Remove the drive belt as outlined in Section 9.6.
6) Release any bent tabs on the lock washer around the 75 mm nut holding the drive axle set to the frame (Figure A).
7) Remove the 75 mm nut holding the drive axle set to the frame using the large socket available from Matrix (Figure B).
8) Remove the drive axle set from the right side and clean any debris from the frame (Figure C).
9) Reverse steps 1-8 to install a new drive axle set, making sure to tighten the 75mm nut to 100 N-m torque and rebend the lock washer tabs to
secure the nut. Be sure to re-tension the belts as outlined in Sections 9.5 and 9.6.
10) Test the Elliptical Trainer for function as outlined in Section 9.21.
FIGURE A
FIGURE B
FIGURE C
CHAPTER 9: PART REPLACEMENT GUIDE
Vista de pagina 50
1 2 ... 46 47 48 49 50 51 52 53 54 55 56 ... 89 90

Comentarios a estos manuales

Sin comentarios